Installation Instructions to the bamboo decking board--REBO
Decking Material:
There are four surface designs of bamboo decking:
1. MF021/DF021: flat surface design
2. MF121/DF121: small wave grooved surface design
3. MF321/DF321: big wave grooved surface design
4. MF621/DF621: small groove surface design
Customers could choose the styles they like.
Decking Accessories:
1. Joist: as the base before installing the decking. Wood, metal, bamboo material, all is ok, whatever you need.
2. Clips and Screws: stainless steel material. For decking clips, REBO suggests DC05 clips( the first image ), it is stronger in griping, the gap between the two boards is about 6-7mm. For siding clips, you could use our DC06( the second image ) for the good looking after the installation.
3. Electric Saw 4. Steel Tape 5. Spirit Level 6. Rubber Hammer 7. Electric Screw Driver
Preparation
1. Before installing, please keep the products in dry and shade place, avoid the sunshine and the rain. Defects in surface caused by improper storage, is insufficient to cause customer complaint.
2. Before installation, clean up the worksite, make sure the basic is flat and stable, the drainage is smooth and conforms with the requirement of the construction design.
3. The joists should be fixed on stable cement-blocks or cement-tiles. Ensure decking slope 1-2 degrees from level in order to shed water.
4. The distance between the joists must be between 450 to 500mm. By a deck of 1860mm length need min.5 joists.
5. Distance from floor to the bottom of the decking should be 80-150mm.
Installtion Guild
1. The base installation
1) Minimum: Cement-tiles under the joists
2) Professional: Use double-layer joists on cement-tiles for long-term stability
2. The head jointed: with tongue and groove head, the two boards can be jointed together easily
Installation Instruction
1. Siding Installation Method: You could use DC 06 for begining and ending desk
2. Decking with symmetrical grooved in two length sides can be fixed with clip DC05. Distance between the deck is about 6-7mm after the installation.